St. Stephen’s Evangelical Lutheran Church and School | Beaver Dam, WI | 920.885.3309

Worship Service Schedule

Sunday: 8:00 a.m., 10:00 a.m.
Thursday: 6:30 p.m.
Friday: 1:30 p.m. (Shortened)

+
<>

WELCOME!

 

ST. STEPHEN’S EVANGELICAL LUTHERAN CHURCH

Striving to speak God’s saving truth in love. Ephesians 4:15

 

 

 

 

JOIN US FOR WORSHIP!

RADIO SERVICE ARCHIVE

Broadcasting the gospel in word and song since 1973 on WBEV.
Click for streaming audio archive of our radio services.

Online Giving

We now have options for Online Giving.

Go to Online Giving

Restoration Summary, March 31, 2024

Categories: News

In January Conrad Schmitt Studios presented us with two options for a painting plan. The winning option had blue highlights on the transept ceiling, and an open stencil design on the ribs, based on stencils in old photographs of St. Stephen’s. Here is the computer mock-up that was proposed by Conrad Schmitt Studios:

And here are some close-ups of the what it looks like, now that most of the painting is done:

No photo description available.Rib stencil in the balcony near the organ with ribbon stencil and gilded line.

May be an image of measuring stick and lace
Detail of ribbon stencil and gilded line. 
No photo description available.
Arches over the organ console.
No photo description available.
Detail of smaller arches. Gold leaf lines in progress. (Gold leaf lines have many steps in the process: tape, glue, gold leaf, varnish, removal of tape, and then touch up.)
No photo description available.
Balcony view of arches and ribs.
No photo description available.
Painted arch in the chancel with gilded grape corbels.
No photo description available.
“Hot cocoa” wainscott stencil in chancel near the altar.  
No photo description available.
Windows under the balcony.
No photo description available.
Another view of the north wall from under the balcony.
May be an image of lighting and indoors
View of the south wall from under the balcony.
May be an image of 2 people
View from under the balcony. Plastic and masking tape mostly removed.
As the project progressed, God’s people showed their generosity, and new opportunities for improvements opened up. We will be replacing our lamps in the lanterns, keeping the classic look, but with higher powered bulbs which are dimmable. This will greatly help visibility during evening services.
We are also moving forward on flooring. Two carpet samples were displayed to the congregation in late March, and with an advisory poll we chose this design called “Wrought Iron.”
May be an image of welcome mat
Pews will be respaced since they are presently unevenly spaced. Some were closer together, especially in front. We will have a space of about nine feet in the back, both for more room to move, and for additional gathering space before and after services. Notches for wheelchairs will be added in front. The carpet in the chancel (altar area) will be replaced with hardwood, and the steps in front of the altar will be widened to better accomodate classes and choirs singing in the front. (We presently have one 18 inch step and a 9 or 10 inch step.) Some flexible seating will be put on the south side in the back anticipating an audio / visual / lighting desk.
Author: admin_ssbdWELS

WP2Social Auto Publish Powered By : XYZScripts.com